Production Time
Shisha Charcoal Production Time
Reliable timelines for every order size — from 20'ft to 40'ft containers

Shisha Charcoal Production Time
From Order to Container — On Time
20'ft Container
15 days
(18 tons)
40'ft Container
25 days
(26 tons)
Inner Box / Master Box Printing
2–3 weeks
(Custom design)
Packaging
3–6 days
(Final packing stage)
⚠️ All of this depends on the situation at that time.
Production times may vary based on current order volume, materials availability, and shipping schedules.
Port of Loading
Primary: Belawan Port (Medan), Panjang Port (Lampung)
Secondary: Tanjung Priok Port (Jakarta), Tanjung Perak Port (Surabaya) or Semarang Port